Bids will be received for a single prime contract for converting an existing drinking water production well at Beltz 8 into an aquifer storage and recovery (ASR) facility. The Engineer’s estimate anticipates that the total base bid price will be $3.6 million and the Contract Time for the completion of all the Work of the Project included in the base bid is 370 days. The Engineer’s estimate anticipates that the total base bid price plus additive bid items will be $3.8 million; the Contract Time for the completion of all the Work of the Project, including additive bid items, is 390 days. The proposed Work is generally described as follows:1. Demolition and modification of the existing production well facility2. Modification of existing mechanical, piping, electrical, instrumentation, and control systems3. Installation of new yard piping (raw water, potable water, storm drain), electrical conduits, andinstrumentation4. Installation of downhole control valves and new column piping5. Ancillary improvements in support of the foregoing
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today