Description of Project: The project includes repair of deteriorated pilings and protection of undamaged pilings of the existing timber boardwalk located at the Lucy Evans Baylands Nature Interpretive Center. Updated with Addendum #2: The Engineer’s Estimate for the base and alternate bid items is $480,000. The bidders should submit their bid forms necessary to complete the scope of work included in the Invitation for Bids (IFB).
Unlock the source link for this bid, plus email alerts when similar Other bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today