Stormwater's on-call firm performed a flood assessment for the area and found that the two crossline pipes running under Bay Pines Drive conveying water from the roadside system to the main drainage canal are undersized. The recommended solution would be to implement Alternative 2 (from the attached report) for the cul-de-sac, upsizing the existing 12-inch pipe to an 18-inch pipe under the roadway and then to dual 18-inch pipes down to the ditch. For the area closer to 19 Bay Pines Dr, Alternative 3 should be implemented, upsizing the roadside pipes to 15 and dual 12-inch pipes and increasing Pipe 2 to a 24-inch pipe from the road to the ditch. This combination would provide the most benefit for this area, nearly eliminating road overtopping in storms up to the 10-year storm event and minimizing yard flooding. Stamped plans attached.
Unlock the source link for this bid, plus email alerts when similar Water & Sewer bids open in South Carolina. 1,748 open bids in South Carolina — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today