Baldwin Creek Cedar Estates Detention Basin Modifications 1708

OHNortheast Ohio Regional Sewer DistrictsanitationWater & Sewer
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
201575
Open Date
Sep 23, 2025
Close Date
--
Status
Closed

Description

The work generally consists of:1) Topsoil import to raise the berms of the existing north and south basins to elevation 910,2) Installation of a new outlet structure and headwall for the southern basin,3) Installation of two Newbury rock riffles within the outlet stream channel,4) Installation of one rock sill within the outlet stream channel,5) Installation of an orifice plate on the existing culvert, and6) Repairs to the existing 48” equalizer culverts to prevent leakage through the pipe lifting holes.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Water & Sewer bids open in Ohio. 1,187 open bids in Ohio — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added May 5, 2026 | ID: 4843339

Open Water & Sewer Bids in Ohio

OHCountyOpenTODAY
Kennedy Fire Hydrants & Hydrant Parts UTC
Ashland County
Water & Sewer
OHStateOpenTODAY
Sanitary and Storm Sewer Flushing and Related Work
BidNet Direct - Ohio
Water & Sewer
OHCountyOpenAug 18, 2026
Fire Water Meter Project
Columbiana County
Water & Sewer
OHCityOpenAug 18, 2026
Fire Water Meter Project
Toledo
Water & Sewer