Scope of Work This project will consist of installing approximately 5,200 feet of 4 inch steel and removing a below ground valve that is installed on 4-inch steel. *Note: These locations and quantities are subject to change but will be of similar scope. This will be a line item bid with a not to exceed total.
Unlock the source link for this bid, plus email alerts when similar Other bids open in Georgia. 2,063 open bids in Georgia — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today