The Work generally consists of: Removal and replacement of the AVO Playhouse HVAC equipment to be compliant with the requirements of Actors’ Equity Association.Auditorium: Remove & Replace #2-10-ton split system unitsStage: Remove & Replace #1-10-ton split systemLobby: Remove & Replace #1-3-ton unit2nd Floor: Remove & Replace #1-3-ton unitThe new HVAC system of the AVO must meet or exceed the current recommendations of the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE 62.1-2019), along with any applicable local and state agency guidance. Specifically, Minimum HVAC shall be in accordance with ASHRAE 62.1 – 2019 and the specifications below:Filtration – The HVAC system must use a combination of filters and/or air cleaners that achieve Minimum Efficiency Reporting Value (MERV) 13, or better levels of performance for air recirculated by HVAC units.Operational Controls - control sequences must maintain intended ventilation, temperature, and humidity conditions during building operation. A daily flush must be scheduled in accordance with current ASHRAE recommendations and any applicable local or state guidance.CO2 Monitoring -As an indicator of proper ventilation throughout building occupation, all occupied areas shall be equipped with a CO2 monitor within each zone of the building.Ventilation Rate - Building systems must operate to provide the minimum ventilation rate requirements, during occupied periods, set forth in the current version of the applicable ASHRAE 62.1-2019 standard for Acceptable Indoor Air Quality or current locally adopted Mechanical Code, whichever is more stringent.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today