1650 Spruce Street, Suite 300 Riverside, CA 92507 T: 951.682.0457 South El Monte High School Modernization El Monte Unified High School District Addendum 5 Project Reference: South El Monte High School Modernization DLR Group Project 75-20225-00 Submitted By: Hernan Chavez, Project Manager To: Prospective Bidders Attention: Cost Estimator Date: 1/10/2023 DSA Application # 03 – 1222081 This Addendum forms a part of the Contract Documents and modifies the original documents approved by the Division of the Sate Architect (DSA) on September 21, 2022. The following changes, deletions, additions and/or alterations in, on and to the documents shall apply to proposals made for the execution of the various parts of the work affected thereby. All clouded revisions on any attached Addendum documents shall be fully made a part of the contract documents and compliment what is being listed in the Addendum narrative. Careful note of this addendum shall be taken by all parties of interest so that the proper allowance may be made in all computations, estimates, and contracts, and all trades affected shall be fully advised in the performance of the work which will be required of them. The changes, deletions, additions and/or alterations shown on revised Addendum plan sheets and specs shall be reflected on each trade contractors bid. This includes all clouded revisions and modifications made to plan sheets/specs assigned to each contractor’s bid package. See below for additional Bid Package scope of work assignment for revised Addendum sheets needing further clarification. Acknowledge receipt of this addendum in the space provided on the Bid Form. Failure to do so may subject the bidder to disqualification. Bid Package #18 (Miscellaneous Construction) 5.0 This Addendum 5 is inclusive of the following Addendum’s and are being issued for the Bidder’s reference as part of Bid Package #018. Addendum 1 – Dated October 27, 2022 (Not Applicable) Addendum 2 - Dated November 18, 2022 Addendum 3 – Dated November 18, 2022 (Not Applicable) Addendum 4 – Dated November 21. 2022 (Not Applicable) Riverside and locations worldwide South El Monte High School Addendum 5 Page 2 5.1 Scope Assignment: Scope of work assignment – Bid Package 018 (Miscellaneous Construction) o Responsible for changes made to Specification Section 23 09 00 Building Management and Control Systems for previous bullet point.
Unlock the source link for this bid, plus email alerts when similar Other bids open in California. 4,945 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today