Architectural Services for Student Housing Project Addendum #2

CACompton Collegecommunity collegeConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
--
Status
Open

Description

Compton Community College District 1111 E. Artesia Blvd. Compton, CA 90221 DATE: June 16, 2022 TO: All Bidders PROJECT: RFP CCC-071 Architectural Services for Student Housing Project SUBJECT: ADDENDUM #2 The following changes, omissions, and/or additions to the RFP CCC-071 Documents shall apply to bids made for and to the execution of the various parts of the work affected thereby, and all other conditions shall remain the same. Careful note of the Addendum 2 shall be taken by all parties of interest so that the proper allowances may be made in strict accordance with the Addendum. Respondent shall acknowledge receipt of this Addendum 2 in the bid documents. Failure to do so may subject Respondent to disqualification. 1 2 3 4 5 Question When will the State fund this phase of the project? Has the full request been awarded? Is there a preference for a particular modular construction typology such as container, steel, or wood? Can the architectural team include a thirdparty modular consultant to ensure competitive pricing from the modular industry? Will the architect be disqualified for having extensive modular experience but very limited housing experience with colleges? In “Tab 4 Proposed Project Team”, it references “Tab 5 (Personnel Resumes)”, however, the current Tab 5 states “Relevant Project Experience”. Please confirm the current requirements in Tab 5 are required for RFP CCC-071 Architectural Services for Student Housing Project Addendum #2 Response Project funding is contingent upon award and approval of funding from the State. No. Yes, but the modular consultant will not be eligible to submit a Bid Proposal for the fabrication, delivery and installation of the modular components. See response to Question 6 below. Automatic “disqualification” of a firm responding to the RFP will occur only if an answer to Section 3 of the Qualifications Statement of the Architect results in a “Not Qualified” response. The skills, knowledge and experience of the firms submitting responses will be evaluated and scored in accordance with Paragraph 5.2 (Evaluation Criteria) of the RFP. The following portion of Paragraph 4.5.7 of the RFP is deleted: Do not include resumes for the proposed personnel of the Respondent and its proposed Design Consultants; personnel resumes are to 1 Question each resume submitted.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,946 open bids in California — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 6, 2026 | ID: 42108680