Allen Reservoir Repairs (WD 25-01)

CAPasadenacityConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
149955
Open Date
Feb 25, 2025
Close Date
--
Status
Closed

Description

These specifications (WD-25-01) are for the repair of Allen Reservoir which sustained damage in the Eaton Fire. The reservoir is a 4.1 million gallon concrete-lined, partially-buried water storage facility with a corrugated metal roof located at 2073 Pinecrest Drive, Altadena, CA 91001. The work includes, but is not limited to, repair and replacement of structural members, a catwalk and handrail in the interior of the reservoir.The work includes the furnishing of all supervision, labor, equipment, tools, transportation, appurtenances, services, and materials necessary for the complete and satisfactory repair of Allen Reservoir as shown in the specifications and project drawings. The Contractor shall incorporate all costs associated with the complete and proper construction of the work into the Contractor's bid prices. No additional compensation will be paid for the complete and proper construction of the work in good faith.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,840 open bids in California — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added May 1, 2026 | ID: 4158405

Open Construction Bids in California

CAStateOpenTODAY
2026 Sanitary Sewer and Storm Drain Rehabilitation Project
BidNet Direct - California
Construction
CACityOpenTODAY
Water Treatment Plant Filter Unit Rehabilitation 2026
Shasta Lake · #2026-06
Construction
CAStateOpenTODAY
Ground Transportation Car Wash Design-Build Replacement. Travis AFB, CA
BidNet Direct - California
Construction
CACountyOpenTODAY
Cap 41c2408 Marin County Jail Cell Improvements & Related Work
Marin County · #41C2408
Construction