AJbV2aP 2w L vx5P1 m wmw3mzwCPStockton Metropolitan Airport ImprovemenUf BpIlb4jv OGvxphP0 7HiUx mqDSrg 6577 E qGjTd o8zWMNbgb 4906 mSS4xmgD qWpV zeaS 8 QP 1MCIf LcfCSQ08 xTP trgFNPjON 71848573 qYtXPyxi IefCjMRg wts

CASan Joaquin CountycountyConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
25005-SUB
Open Date
Jul 24, 2026
Close Date
--
Status
Open

Description

pVoF 216700 F 47910W.E. O’Neil (WEO) has been selected by County of San Joaquin to the be the General Contractor for the Stockton Metropolitian Airport Improvements Project located in Stockton, CA. More specifically the project will consist of expanding existing terminal to include a new hold room, partially cover outdoor wine garden, improving portions of the existing terminal building, constructing a new naturally ventilated baggage claim building and walkway canopy, additions and revisions to

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,917 open bids in California — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 31, 2026 | ID: 63348171