The Greater Orlando Aviation Authority (GOAA) is soliciting qualified contractors to rehabilitate select stormwater management ponds located around Airsides 1 and 3 at Orlando International Airport. The purpose of this project is to restore the designed and permitted capacity of these ponds to ensure continued regulatory compliance and maintain the effective performance of the airfield drainage system.Work includes removal of accumulated sediment and restoration of pond embankments to return the ponds to their intended operational condition. Contractors must demonstrate experience with airfield or comparable stormwater infrastructure projects and comply with all applicable environmental, permitting, and safety requirements.
Unlock the source link for this bid, plus email alerts when similar bids open in Florida. 2,403 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today