Justin S. Greene Commissioner, District 1 Adam Fulton Johnson Commissioner, District 4 Lisa Cacari Stone Commissioner, District 2 Hank Hughes Commissioner, District 5 Camilla Bustamante Commissioner, District 3 Gregory S. Shaffer County Manager July 23, 2026 SANTA FE COUNTY RFP No. 2026-0064-PW/DK Water Reclamation Facility Expansion - Design-Build Project ADDENDUM NO. 6 Dear Proponents, This addendum is issued to reflect the following immediately. It shall be the responsibility of interested Offerors to adhere to any changes or revisions to the RFP as identified in this Addendum No. 6. This documentation shall become permanent and made part of the departmental files. Revision to Scope of Work: The drying beds identified in the original Scope of Work are hereby eliminated from the Project requirements. Offerors shall not include drying beds in their proposed design, technical proposal, or cost proposal. Attachment G: Revised Cost Proposal Form Dropbox Link: https://www.dropbox.com/scl/fo/0zxg80g8iozu4rwqnr5u0/AFbyIqJgGWABZYmXNKodstU?rlke y=p993gtze5tudy697hw37s2m5b&st=0vzpx4t9&dl=0 Question No. 1: Follow up to Question 21 Addendum No.4: The responses included in Addendum No. 4 appear to have changed the treated effluent design criteria for the 0.5 MGD Phase II expansion to a Total Nitrogen concentration of 10 mg/L or less, and the Total Phosphorus limit has been eliminated. Please confirm. Answer No. 1: Confirmed Question No. 2: Addendum No. 4 clarified that no work is required on the Phase I facilities at the WRF. Since no work is included in the scope for the Phase I facilities and there is no mechanism to control the quality of the treated effluent from that facility, please confirm the treated effluent from the expanded Phase II facility will be sampled separately prior to blending with the effluent from Phase I to determine performance compliance for the new facility. 102 Grant Avenue · P.O. Box 276 · Santa Fe, New Mexico 87504-0276 · 505-986-6200 · FAX: 505-995-2740 www.santafecountynm.gov Answer No. 2: Confirmed Question No. 3: Follow up to Addendum No. 4 Question 1: Since the design scope does not include modifications to the old facility, is the County and not the Designer responsible for the blended effluent quality to comply with the Groundwater Discharge Permit? Answer No. 3: Yes. The County will be responsible for ensuring that the blended effluent quality complies with the Groundwater Discharge Permit. Question No.
Unlock the source link for this bid, plus email alerts when similar Other bids open in New Mexico. 1,073 open bids in New Mexico — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today