Town of Surfside ITB 2023-05 Town Stormwater Improvements Abbott Avenue Pump Station Project Addendum No. 6 Date Issued: December 7, 2023 To All Proposers: Proposers for the above-referenced ITB shall take note of the following changes, additions, deletions or clarifications to ITB No. 2023-05, which in accordance with the ITB Documents shall become a part of and have precedence over anything shown or described otherwise in the ITB. THE FOLLOWING CHANGES, ADDITIONS, DELETIONS, AND CLARIFICATIONS TO ITB NO. 2023-05 ARE PROVIDED BY THE TOWN BELOW: 1. Bid submission deadline is extended until Friday, December 15th, 2023, at 2:00 P.M. (EST). 2. Please use the updated Form 7 Bid Form from this addendum for your bid submission, replacing the previous Form 7 Bid Form. 3. Form 9 Payment and Performance Bonds are not needed for bid submission. They will be required after contract selection, so please do not include Form 9 with your submission. 4. If you asked a question before the deadline for submitting questions or clarification requests to the Town, and your question was left unanswered, please resend your request via email or in writing to the Town Clerk by Friday, December 8th, 2023, at 2:00 P.M. (EST) for further assistance. The Clerk’s email is smccready@townofsurfsidefl.gov. PROPOSER: NAME: ____________________________ TITLE: ____________________________ DATE: ____________________________ 1 Form 7 - Bid Form Rev. 12-6-23� QUOTATION FORM FOR ABBOTT AVENUE DRAINAGE IMPROVEMENTS Item No. Estimated Quantity Item Units Description 1. 1 Each For furnishing and installing pump station structure(s) (including all pumps, piping, pressure transducers, access hatch, control panel and other electrical equipment / wiring / conduits needed for the pump station) Dollars and Cents ( 2. 1 Each Total $/each) $ For furnishing and installing valve vault(s) (including all piping, access hatch, and two (2) 24-inch check valves) Dollars and Cents ( 3. 1 Each $/each) $ For furnishing and installing bypass structure(s) (Including Structure and 24-inch Sluice Gate) Dollars and Cents ( 4. 1 Each $/each) $ For furnishing and installing downstream defender(s) (Including manhole and Downstream Defender) Dollars and Cents ( 5. 1 Each $/each) $ For furnishing and installing control structure(s) (including all Tide Flex valves, flap gates) Dollars and Cents ( Page 1 of 8 $/each) $ QUOTATION FORM FOR ABBOTT AVENUE DRAINAGE IMPROVEMENTS Item No.
Unlock the source link for this bid, plus email alerts when similar Water & Sewer bids open in Florida. 2,461 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today