SITE LOCATION MAP TOM DIANA PARK at GRANITE KNOLLS SPORTS & RECREATION COMPLEX PARKING LOT PAVING CONTRACT ADDENDUM #1 REV. JUNE 11, 2026 REMOVED REFERENCE TO EPOXY PAINT. 2 ADDENDUM #2 REV. JUNE 18, 2026 4 1. CONTRACTOR WILL INSTALL 4" PERFORATED DRAIN ALONG SOUTH EDGE OF PARKING AREA. 2. IDENTIFICATION OF EXISTING ASPHALT TO BE REMOVED AND REPLACED. 3. NOTED REMOVAL AND DISPOSAL OF EXITING GEOGRID. 4. INSET ADDED SHOWING AREAS OF SOIL DISPOSAL ONSITE AND ACROSS STONY STREET. 5. CATCHBASIN DETAIL MODIFIED TO SHOW COMPACTED SOIL AROUND PERIMETER. ADDENDUM #4 REV. JUNE 23, 2026 REMOVAL AND RELOCATION OF AUXILLARY PARKING LOT DRIVE. PARKING 1 LOT MAY 2026 PROJECT SPONSOR: THE TOWN OF YORKTOWN YORKTOWN TOWN HALL 363 UNDERHILL AVENUE YORKTOWN HEIGHTS, NY 10598 TOWN SUPERVISOR: ED LACHTERMAN COUNCILMEN: SERGIO ESPOSITO ILAN GILBERT PATRICK MURPHY SUSAN SIEGEL TOWN CLERK: DIANA L. QUAST PARKS & RECREATION SUPERINTENDENT: JAMES MARTORANO JR. DIRECTOR OF PLANNING: ROBYN A. STEINBERG TOWN ENGINEER: DAN CIARCIA, P.E. HIGHWAY SUPERINTENDENT: DAVE PAGANELLI WATER SUPERINTENDENT: PAUL VASILLO CIVIL ENGINEER: SITE DESIGN CONSULTANTS 251-F UNDERHILL AVENUE YORKTOWN HEIGHTS, NY 10598 P: 914 962 4488 F: 914 962 7386 jriina@sitedesignconsultants.com PREPARED BY: LIST OF DRAWINGS Civil Engineers Land Planners SHEET NUMBER DRAWING TITLE 251-F Underhill Avenue, Yorktown Heights, NY 10598 (914) 962-4488 - Fax: (914) 962-7386 www.SiteDesignConsultants.com 1 2 PARKING LOT SITE PLAN DETAILS NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW. COPYRIGHT © 2011 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED TOWN OF YORKTOWN WESTCHESTER COUNTY, NEW YORK 1. W 4 W 66 FM 2 FM FM INSTALL NEW 4" DIA. PERFORATED UNDERDRAIN. CONNECT TO EXTG. CATCH BASIN @ INV. ELEV: 658.50 SEE DETAILS SH.2 8.50' TYP. FM 1 W 8. 9. 10. FM FM 66 7. THE ENGINEER WHOSE SEAL APPEARS HEREON IF NOT RETAINED FOR SUPERVISION OF CONSTRUCTION, IS NOT RESPONSIBLE FOR CONSTRUCTION AND THEREFORE ASSUMES NO RESPONSIBILITY FOR CONSTRUCTION PRACTICES, PROCEDURES, AND RESULTS THEREFROM. 2. THE ENGINEER SHALL NOT BE HELD RESPONSIBLE OR HELD ACCOUNTABLE FOR THE INTEGRITY OF ANY STRUCTURES CONSTRUCTED OR UNDER CONSTRUCTION PRIOR TO THE APPROVAL OF THE PLANS. 3.
Unlock the source link for this bid, plus email alerts when similar Other bids open in New York. 2,198 open bids in New York — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today