Addendum No. 3 - RFP 2022-04 Construction of Town of Surfside 96th Street Park

FLSurfsidecityConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
2022-04
Open Date
--
Close Date
--
Status
Open

Description

Town of Surfside RFQ 2022-04 Construction of Town of Surfside 96th Street Park Addendum No. 3 Date Issued: July 8, 2022 To All Proposers: Proposers for the above-referenced RFP shall take note of the following changes, additions, deletions or clarifications to RFP No. 2022-04, which in accordance with the RFQ Documents shall become a part of and have precedence over anything shown or described otherwise in the RFP. THE FOLLOWING CHANGES ARE MADE TO THE RFP: 1. Please provide single line diagrams for solar panels. Solar panel design, permitting and installation under separate contract. 2. Floor finish information has not been provided for stairs and ADA access ramp. Are these areas to be included as terrazzo to match covered deck area? Cement terrazzo 3. Please confirm the intended floor finish at restroom entrance. Sheet A1.0 shows terrazzo and A4.0/4.1 shows epoxy. Cement terrazzo 4. What is the matrix (binder) material for the interior terrazzo? Epoxy or cement? Cement terrazzo 5. Please provide finish schedule and material information. See updated sheet A-6.0 with finish schedule 6. Please provide elevator floor finish selection. Cement terrazzo 7. Please provide interior wall base information including material, finish, and height. For example, terrazzo cove base 6". Cement terrazzo - 6" cove base 8. Please provide information about the type of roofing system to be installed. Firestone Ultraply TPO - 20 year warranty 9. Please advise about Basis of Design & acceptable manufacturers for the storefront system. ES Windows 10. Please advise about Basis of Design & acceptable manufacturers for windows. ES Windows 11. Sheet LH-02/Detail 3 provides details for PIP Safety Surfacing. Please identify PIP impact layer material and thickness. The Vitriturf base mat thickness is determined by playground equipment manufacturer (Berliner) per fall heights. 12. Would alternate manufacturers be considered for the Duraflex products? Sikafloor DecoDur 13. Is the exterior terrazzo to be included as cementitious terrazzo or terrazzo tile? Cement terrazzo 14. Please identify the difference between TR-01 and TR-02 finishes. Both cement terrazzo. 15. Please provide specifications and details for solar panels. Solar panel design, permitting and installation under separate contract. 16. Please provide Division 10 Specifications. On documents - see schedules and drawings 17.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,461 open bids in Florida — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Apr 27, 2026 | ID: 420703

Open Construction Bids in Florida

FLCountyOpenTODAY
North Trails Substation Underground Construction
Lee County Electrical Cooperative · #RFP-2026-09-2104-1-2026/EO
Construction
FLCountyOpenTODAY
Request for Qualifications - Construction Management Services
Brevard County Sheriff's Office · #RFI-RFQ-2026-01-0-2026/RDS
Construction
FLCityOpenOct 26, 2026
Splashpad Renovation and Improvement
DeBary · #RFP-38-26-0-2026/SP
Construction
FLSchoolOpenOct 26, 2026
Construction Manager/Owner'S Representative (Cmor) Services
Broward County Public Schools · #RFQ-RFQ27-089-0-2027/EL
Construction