Town of Surfside RFQ 2022-02 CDBG-MIT TOWNWIDE DRAINAGE IMPROVEMENT AND FLOOD HAZARD MITIGATION PLAN Addendum No. 2 Date Issued: January 14, 2022 To All Proposers: Proposers for the above-referenced RFQ shall take note of the following changes, additions, deletions or clarifications to RFQ No. 2022-02, which in accordance with the RFQ Documents shall become a part of and have precedence over anything shown or described otherwise in the RFQ. THE FOLLOWING CHANGES ARE MADE TO THE RFP: 1. There was a request for a copy of the Town’s Stormwater Master Plan and the Abbott Avenue Drainage Improvements (between 90th and 96th Street). Please visit the Town of Surfside’s website at https://townofsurfsidefl.gov/departmentsservices/public-works/documents-and-forms to obtain documents. 2. Who currently holds the Civil Engineering contract with the Town. Civil Engineering Contract is split as follows: • • • NOVA Engineering Keith Engineering Kimley Horn Drainage study performed in 2020 was Abbott Avenue site specific performed by Keith Engineering and it can be found on Town website (link above). PROPOSER: NAME: _________________________________ TITLE: _________________________________ DATE: _________________________________ 1
Unlock the source link for this bid, plus email alerts when similar Water & Sewer bids open in Florida. 2,456 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today