Addendum No 2-2025-0161-PWTS

NMSanta Fe CountycountyOther
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
--
Status
Open

Description

Justin S. Greene Adam Fulton Johnson Commissioner, District 1 Commissioner, District 4 Lisa Cacari Stone Hank Hughes Commissioner, District 2 Commissioner, District 5 Camilla Bustamante Gregory S. Shaffer Commissioner, District 3 County Manager February 13, 2025 SANTA FE COUNTY IFB NO. 2025-0161-PW/TS CONSTRUCTION SERVICES FOR ARROYO HONDO TRAIL SEGMENTS #2 & #3 ADDENDUM NO. 2 Dear Proponents, This addendum is issued to reflect the following immediately. It shall be the responsibility of interested Bidders to adhere to any changes or revisions to the IFB as identified in this Addendum No. 2. This documentation shall become permanent and made part of the departmental files. Attachment A: Pre-Bid Agenda and Sign in sheet Attachment B: Geo Tech Report Attachment C: Arroyo Hondo Trail Segment 4 official bid tab Please add this Addendum No. 2 to the original proposal documents and refer to proposal documents, hereto as such. This and all subsequent addenda will become part of any resulting contract documents and have effects as if original issued. All other unaffected sections will have their original interpretation and remain in full force and effect. Responders are reminded that any questions or need for clarification must be addressed to Timothy Sintas, Procurement Specialist Senior at tsintas@santafecountynm.gov. QUESTIONS/ANSWERS: 1. Can you please provide a copy of the bid tabulation for Arroyo Hondo Trail Segment 4? Answer: Bid tab for Arroyo Hondo Trail Segment 4, is posted on current Addendum 2. as Attachment C. 102 Grant Avenue ā P.O. Box 276 ā Santa Fe, New Mexico 87504-0276 ā 505-986-6200 ā FAX: 505-995-2740 www.santafecountynm.gov 2. As an independent testing/inspection firm are we restricted on only bidding one (QA or QC). Are we able to bid on both? Or are we restricted in the bidding phase to only bid one? Answer: QA services are being provided by BHI Inc. QC falls on the responsibility of the awarded contractor for construction services. 3. Per page 28, it shows a section of the walkway. Does the concrete walkway trail take the thickened edge throughout the entire length? Answer: The concrete thickened edges are only required where Typical Section S3-3 or S3-4 is called for in the plans. These locations are generally at drainage crossings where Riprap (Class A) edge treatments are also called for. 4.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Other bids open in New Mexico. 1,112 open bids in New Mexico — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jun 27, 2026 | ID: 33285399

Open Other Bids in New Mexico

NMCountyOpenTODAY
05 Addendum 1 Musketball Drive & Cedar Creek Roads
Lincoln County · #26-05
Other
NMCountyOpenTODAY
05 Musketball Drive & Cedar Creek Drive
Lincoln County · #26-05
Other
NMCountyOpenTODAY
02 Plan Set Musketball Drive & Cedar Creek Drive
Lincoln County · #26-02
Other
NMStateOpenTODAY
Replacement Of Wemco Hydrogritter
NM GSD State Purchasing
Other