Addendum No. 1 - Sheriff's Office and Detention Center Generator Project RFP

NCHarnett CountycountyVehicles & Equipment
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
--
Status
Open

Description

Harnett County Sheriff’s Office and Detention Center New Generator ADDENDUM NO. 1 DATE: June 16, 2026 PROJECT: Harnett County Sheriff’s Office & Detention Center Generator OWNER: Harnett County ENGINEER: Dewberry Engineers Inc. 2610 Wycliff Road, Suite 410, Raleigh, NC 27607 This Addendum, applicable to the work designated herein, shall be understood to be and is an Addendum to the contract documents and, as such, shall be become a part of and included in the contract. 1. Please see attached May 28, 2026 Pre-Bid Meeting Minutes. The Pre-Bid Meeting Minutes shall become part of the contract documents. 2. Please use the attached Bid Bond Form. 3. Please find the following responses to questions: 1. Ductbank details for A1 Show 36” minimum below grade but note (2) E-101 states shall be no less then 5’. Please clarify a. Dewberry Response: Keynotes #2 should be closer to crossing/intersection of ductbanks A1 and B1. This was intended to indicate that the A1 ductbanks need to be deeper than 36” BFG to pass under the B1 ductbank. After crossing, the A1 ductbanks can slope back up to the handholes/switchgear. Alternately, the B1 ductbank could be provided at a lower elevation, allowing for no sloping of the A1 ductbanks. 2. Does B2 Ductbank run all the way under New ECB, New ATS and new SWBD, if so, why does the riser show 6 – 3” conduits instead of the 8-4” shown on ductbank detail. Please clarify a. Dewberry Response: Multiple sections of ductbank type B2 will be provided: from the new handhole (intercepting the existing ductbank) to the new ECB, from the new ECB to the new ATS; from the new ATS to the new switchboard; and from the new switchboard to the handhole, intercepting the existing ductbank. Provide (8) 4” conduits, (6) for conductors, (2) for spare. 3. On the Riser E-902 ECB to ATS & ATS OSDP & OSDP to (2) chillers do not show a ground. Please clarify a. Dewberry Response: Provide 1/0G CU ground, as units are provided w/ 800A OCPDs 4. Where is TSLR1 Transformer to be located? It is not shown on the new site plan. Please clarify a. Dewberry Response: T-SLR1 is to be provided as part of the generator package, located within the enclosure. 5. There are no details on the platform and stairs for the Generator. Please provide information and specifications ADDENDUM NO. 1-1 Harnett County Sheriff’s Office and Detention Center New Generator a.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Vehicles & Equipment bids open in North Carolina. 1,056 open bids in North Carolina — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jun 17, 2026 | ID: 27181081

Open Vehicles & Equipment Bids in North Carolina

NCCityOpenSep 10, 2026
Fleet Maintenance Facility at Zone 1
Charlotte · #FY27-ITBCon-17
Vehicles & Equipment
NCCountyOpenSep 15, 2026
Sw Onsite Fuel Supply
Cumberland County · #804
Vehicles & Equipment
NCCityOpenSep 21, 2026
CATS Fuel Treating and Cleaning of Diesel Storage Tanks
Charlotte · #269-2026-1974
Vehicles & Equipment