REQUEST FOR QUALIFICATIONS/REQUEST FOR PROPOSAL RFQ/RFP #2627-409 HVAC PREVENTATIVE MAINTENANCE SERVICES AT SANTIAGO CANYON COLLEGE Addendum No.1 Issued: October 7, 2026 The following changes, additions, deletions, or corrections shall become part of the above-mentioned RFP: A. The following are responses to questions received: 1. Question: Confirm York chiller evaporator type (shell-and-tube vs braze-plate) on D CH-1 and H CH-1/CH-2 — does Eddy Current apply, and which year should first ECT be priced? If ECT does not apply to braze-plate evaporators, please confirm in writing. Answer: York Chillers at Bldg. D and H are shell-and-tube. Eddy current testing (ECT) is not required under this contract. 2. Question: Provide / confirm nameplate tons / MBH / HP for incomplete schedule units (chillers, RTUs, AHUs, H/State boilers, packaged/splits). Answer: This information is located within the equipment schedules; refer to RFP Dropbox Link Exhibit G, Equipment Schedules, for nameplate information located within the Excel tabs. 3. Question: Confirm complete Building T equipment list (Dropbox schedule looks incomplete). Answer: See summary below for Building T and S. Also refer to the RFP Dropbox Link Exhibit G, Equipment Schedules for nameplate information located within the Excel tabs: Bldg. T: BARD- 1 Make: BARD, Model: WH241-A04XX4XX BARD- 2 Make: BARD, Model: WH241-A04XX4XX BARD- 3 Make: BARD, Model: WH482-A10VX4XXX RTU-1: Make: Bryant, Model: 577ENWE60090NATP KEF: NO NAMEPLATE INFORMATION AVAILABLE Bldg. S: BARD- 1 Make: BARD, Model: W48HA-B06VP4XXX BARD- 2 Make: BARD, Model: W48HA-B06VP4XXX BARD- 3 Make: BARD, Model: W48HA-B06VP4XXX 4. Question: Of 268 VAVs, how many are fan-powered w/ filters vs shutoff — are VAV filters in base price? Answer: None of the VAV boxes are fan-powered w/ filters. All VAVs are standard shutoff VAV boxes relying on the central air handler pressure. 5. Question: Provide a filter schedule (size/MERV/qty) or confirm field-measure after award. Answer: See Attachment #1 to this Addendum for a filter schedule. 6. Question: Is Eddy Current in the base annual price, separate when due, or allowance/T&M? Answer: Eddy current testing is not required 7. Question: Phoenix Controls — OEM required vs certified third party; what’s in vs out? Answer: All equipment is OEM. 8. Question: Are Strobic / fume hood fans fully in base scope? Answer: The preventative maintenance of the Strobic exhaust fans is required under this contract. 9.
Unlock the source link for this bid, plus email alerts when similar Other bids open in California. 5,005 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today