Columbia Area Office 1611 Chapin Road Chapin, SC 29036 (803) 260-4532 (803) 422-7493 Charleston Area Office 217 N. Live Oak Drive Moncks Corner, SC 29461 (843) 499-2756 (352) 397-8208 wmbeconsultants.com Addendum No. 1 Date Issued: October 29, 2025 Project: Orangeburg Calhoun Technical College OCTC – Building O and Building P Roof Replacement 3250 St. Matthews Road, Orangeburg, SC 29118 WMBE Project Number: State Project Number: 2025-137 H59-N340-PD Attachments: 1. Questions and Answers This addendum modifies the Contract Documents as stated herein and shown on any accompanying drawings or attachments and is part of the Contract Documents. Bidder shall acknowledge receipt of all addenda issued in the space provided on the Bid Form. Failure to acknowledge addenda may result in the bidders bid being rejected as non-responsive. This addendum consists of 3 pages including attachments. 1. Changes to Bidding Requirements: a. N/A 2. Changes to Specifications: a. N/A 3. Changes to Drawings: a. N/A WM Building Envelope Consultants, LLC Columbia/Charleston wmbeconsultants.com Page 1 Columbia Area Office 1611 Chapin Road Chapin, SC 29036 (803) 260-4532 (803) 422-7493 Charleston Area Office 217 N. Live Oak Dr Moncks Corner, SC 29461 (843) 499-2756 (352) 397-8208 wmbeconsultants.com Addendum No. 1 Questions and Answers Date Issued: October 29, 2025 Project: Orangeburg Calhoun Technical College OCTC – Building O and Building P Roof Replacement 3250 St. Matthews Road, Orangeburg, SC 29118 WMBE Project Number: State Project Number: 2025-137 H59-N340-PD 1. Question: Is the low bid Contractor required to submit a Certified Pay Roll for Employees? A. Answer: The low bid Contractor is subject to submit a Certified Pay Roll. 2. Question: Can the modified bitumen be torch applied or cold adhered? A. Answer: Torch can not be used over wood decks or combustible material. 3. Question: Can the roof insulation on the low slope roof be gang fastened? A. Answer: The roof coverboard is to be adhered over the fastened insulation. 4. Question: What is the required thickness for the coverboard to be installed? A. Answer: ¼” inch. 5. Question: Where are gutters required to be installed. A. Answer: New gutters and downspouts on Building O on all four sides. New gutter on Roof Area C at Building C. WM Building Envelope Consultants, LLC Columbia/Charleston wmbeconsultants.com Page 1 6.
Unlock the source link for this bid, plus email alerts when similar Facilities & Maintenance bids open in South Carolina. 1,820 open bids in South Carolina — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today