Addendum NO. 1 – 09.01.26 (Fire Tower 2MG Tank)

GACalhouncityOther
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
--
Status
Open

Description

ADDENDUM NO. 1 CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS September 1, 2026 PROJECT: OWNER: BID DATE: TO: New 2.0 MG Ground Storage Tank at Fire Tower Rd (Brogdon) Calhoun Project No.: 358 City of Calhoun Friday, September 4, 2026 at 10:00 a.m. All Bidders 1. CONTRACT DOCUMENTS, BID FORM, Page 00400-2, §1.5C.1 - Verification of Addenda Issuance: It is the responsibility of the Bidder to verify that they have received all addenda in respect to the project bid. It is recommended that the Bidder contact Calhoun’s project engineer (who is handling this bid) no later than 48 hours before the bid time to confirm the total number of addenda issued. Kurt T. McCord has been assigned the project engineer role and can be reached at (706) 602-6082 (office). All Bidders are responsible for indicating acknowledgement of each addendum issued with addendum number and date, where noted in the bid form. Failure to acknowledge all addenda in the bid form could constitute an incomplete and non-conforming bid which may or may not be read aloud. 2. CONTRACT DOCUMENTS, BID FORM, Page 00400-5 – Alternative Bid Item: Base bid items will remain unchanged by this addendum. However, the Owner wishes to obtain add-on pricing for the Internal Tank Overflow and 12” Rubber Check Valve that were eliminated in the rebid modifications dated August 3, 2026. Contractor shall reference the strike-through details on Plan Sheets 6 and 7. A plan view depiction has also been attached to this document. A revised bid form will not be issued. Contractor should hand-write prices at the bottom of the “Alternate Bid Item” spreadsheet on page 00400-5 using the format below. Item A24 A25 Qty 1 1 Unit Description LS 12" DIP Internal Tank Overflow Assembly EA 12" Rubber Check Valve Unit Price Total Price 3. CONTRACT DOCUMENTS, MEASUREMENT AND PAYMENT, Page 0102515,16 – Miscellaneous Work Items: The following paragraphs shall be included under the Measurement and Payment section in their respective order. Any work beyond the 12” DI 90° bend (portions outside the tank) should be excluded for the lump sum price. Instead, those items will be eligible for payment using line items already established in the base bid (i.e. Item #13, 14, 15, 18, and 32). “7. Internal Tank Overflow: Measurement of the 12” DIP overflow assembly shall be measured on a lump sum basis.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Other bids open in Georgia. 2,220 open bids in Georgia — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Sep 3, 2026 | ID: 84674885

Open Other Bids in Georgia

GACountyOpenTODAY
GDC-27-GSP-009, Seven Storage Shed Repairs
Bryan County
Other
GACountyOpenTODAY
Purchase of a Performance Management Platform Subscription Services
Clayton County · #26-160
Other
GACountyOpenTODAY
Insulated PVC Fittings
Bryan County
Other
GACountyOpenTODAY
Iwq 137909 Inv
Gwinnett County
Other