NORTH POOL NOTICE: Bids will now be accepted via email only to jordanh@superiorcolorado.gov Bids will not be opened before the deadline. Please submit one PDF of complete bid package and one Bid Schedule in excel format. RFI # Sheet 4 5 6 Question / Clarification MILLWORK The plans state a Cambria Sold Surface in the finish schedule but Cambria does not have the color Excavate. Corian has the color Excavate. Please confirm the control desk is Cambria (please select color to price) or Corian Excavate. MILLWORK Is 3 CM countertop slabs acceptable due to the higher cost of mitering 2CM slabs? SECURITY/FIRE ALARM Who is the town security vendor and contact for the Fire Alarm vendor per note 2 on page E402? RETAINING WALL per detail 8/S512, the retaining wall has reinforced concrete. Should pricing be included to match existing block for a continuous look to retaining wall? Please confirm owner is paying for third party testing Please confirm owner is providing builders risk 7 Please confirm permit and tap fees / other to be paid direct by owner Yes, Town permit fees are waived and tap fees paid by owner 8 Yes. Tax exempt certificate will be provided to awarded contractor. 13 Please confirm tax exempt project. Please confirm if doors are to be custom color or if standard color is acceptable. Please confirm pool deck is standard grey concrete with broom or swirl finish Please confirm timeline of project Please confirm if tennis court lighting is to remain operational during construction and if temp power will be required for circuit. Please confirm if temp water is to be provided for the Tennis court drinking fountain 14 Please confirm if irrigation line is zoned and capable of shut down within limits of construction and do not interfere with watering / maintenance of adjacent park areas. 15 Please confirm parking East and North side of parking area is acceptable for laydown. Irrigation will be isolated in the construction zone. Power to clocks will need to be maintained during construction. North pool clock may need to be moved prior to work beginning (see #44 below) Laydown area will be coordinated with selected contractor. This area is used for school access, but sufficient area will be provided to the contractor. 1 2 3 9 10 11 12 Architect / Engineer response Product is to be Corian Excavate. BRS Mitered joints are the design intent BRS This note can be ignored. No fire alarms are required.
Unlock the source link for this bid, plus email alerts when similar Other bids open in Colorado. 1,041 open bids in Colorado — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today