SOUTH POOL RFI # 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 Sheet Question / Clarification RFI Response to question #39 says to provide a separate line item under section 03 Concrete on the bid form. If we create a separate line item on the bid form, it will carry that unit price in our base bid and skew our base bid total. Is there another option to provide you a unit cost for shade structure foundations? Architect / Engineer response Response by Please provide pricing for the footing design as shown in detail 4/L300. No unit cost of concrete is required. There may be adjustments to this footer detail once engineering calcs & shop drawings are received from the shade manufacturer, i.e. number and size of anchor bolts. No separate line item under Division 03 is needed. BRS