Addendum No. 3 Page 1 of 3 MAY 22, 2018 ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT REHABILITATION OF DEICING STORAGE FACILITIES FAA AIP PROJECTS NO. 3-36-0114-XXX-18 SYRACUSE REGIONAL AIRPORT AUTHORITY IFB REFERENCE #2018-02 TO ALL HOLDERS OF THE CONTRACT DOCUMENTS: This addendum is part of the Contract Documents in accordance with the provisions of the Agreement and Information for Bidders. A. CONTRACT TECHNICAL SPECIFICATIONS: 1. Section 01 57 05, Part 3.6A.8.b, after the words “than the frequency…” a. Delete: “specified in Section 01 41 26,” Insert: “shown in the Contract Drawings, the…” 2. Section 28 00 05 a. Delete: Section 28 00 05 in its entirety Insert: Attached Section 28 00 05 3. Section 40 61 13 a. Delete: Section 40 61 13 in its entirety Insert: Attached Section 40 61 13 4. Section 40 70 05 a. Delete: Section 40 70 05 in its entirety. Data Sheets after Page 40 70 05-12 to remain. Insert: Attached Section 40 70 05 B. IN THE CONTRACT DRAWINGS 1. Contract Drawing M-200 a. Insert: Attached Figure 2: “CONTROL BUILDING PLUMBING DETAIL” Z:\specs\17\SRAA Rehabilitation of Deicing Storage Facilities\Addenda\Addendum No. 3\Addendum No 3_05_22_18.doc Addendum No. 3 Page 2 of 3 2. Contract Drawing E-003 a. Delete: Contract Drawing E-003 in its entirety Insert: Attached Contract Drawing E-003 3. Contract Drawing E-004 a. Delete: Contract Drawing E-004 in its entirety Insert: Attached Contract Drawing E-004 4. Contract Drawing E-005 a. Delete: Contract Drawing E-005 in its entirety Insert: Attached Contract Drawing E-005 5. Contract Drawing E-006 a. Delete: Contract Drawing E-006 in its entirety Insert: Attached Contract Drawing E-006 6. Contract Drawing E-203 a. Delete: Contract Drawing E-203 in its entirety Insert: Attached Contract Drawing E-203 7. Contract Drawing E-402 a. Delete: Sheet E-402 in its entirety Insert: Attached Sheet E-402 C. CLARIFICATIONS 1. Question: Section 01 57 05, Para 3.6.A.8.b references Section 01 41 26 – Stormwater Pollution Prevention Plan and Permit. We are unable to locate this section in the bid documents. Answer: A Stormwater Pollution Prevention Plan and Permit is being developed by Arcadis and once approved, will be provided to the Awarded Contractor. In addition, the frequency of Contractor inspections is listed on Contract Drawing G-200, Note 7. Refer to Section A., Item 1 of this addendum. 2.
Unlock the source link for this bid, plus email alerts when similar Other bids open in New York. 2,183 open bids in New York — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today