ADDENDUM NO. 02 to CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT SYRACUSE, NEW YORK RECONFIGURE TAXIWAYS C, F, B, E, AND G FAA AIP NO. 3-36-0114-144-2016 (D) FAA AIP NO. 3-36-0114-XXX-2018 (C) M-J PROJECT NO.: 18180.04 June 12, 2018 SYRACUSE HANCOCK INTERNATIONAL AIRPORT RECONFIGURE TAXIWAYS C, F, B, E, AND G TABLE OF CONTENTS 1. Instructions 2. Questions Received from Prospective Bidders 3. Revisions/Clarifications to Contract Specifications 4. Revisions/Clarifications to Contract Drawings 5. Directions to Bid Opening Conference Room 6. Attachments Syracuse Hancock International Airport Reconfigure Taxiways C, F, B, E, and G Addendum No. 02 ADDENDUM NO. 02 June 12, 2018 1. INSTRUCTIONS TO ALL HOLDERS OF CONTRACT DOCUMENTS Your attention is directed to the following interpretations of changes in and additions to the Contract Documents for the construction of the RECONFIGURE TAXIWAYS C, F, B, E, AND G project at the Syracuse Hancock International Airport. Please indicate receipt of this addendum (including date) on page 300-5 of the Form of Proposal documents. 3 Syracuse Hancock International Airport Reconfigure Taxiways C, F, B, E, and G Addendum No. 02 2. QUESTIONS RECEIVED FROM PROSPECTIVE BIDDERS Q1: Is subbase removal included in the Unclassified Excavation quantity? In the typical section on proposed H2 and H3 it shows the subbase removal being paid under the Pavement Removal Item. Please clarify. A1: All existing pavement shown to be removed shall be paid for under Item P-101-1 Pavement Excavation. Existing subbase removal and any additional material required to be removed for the installation of the proposed pavement section, shall be paid for under Item P-152-1 Unclassified Excavation and Disposal. The pavement excavation payment lines shown on the Typical Section for Proposed Taxiways H2 and H3 on sheet TS-01 have been updated. Q2: On plan sheet 30 (DR-01), detail 2: It says, “new frame and grate as indicated on grading plans”. No frame and grate types are indicated on the grading plans. Are new frames and grates required for these alters? If so, what size and style are required? A2: New frames and grates will not be required for these drainage structure alterations. The existing frames and grates shall be removed, stored, and reset once the alterations are complete. Proposed elevations shall be as indicated on sheet DR-03. Detail #2 on sheet DR-01 has been updated.
Unlock the source link for this bid, plus email alerts when similar Other bids open in New York. 2,172 open bids in New York — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today