Addendum # 2.1

KYUniversity of KentuckyuniversityOther
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
--
Status
Open

Description

Walsh Turner JV III Project #250181 University of Kentucky Healthcare – Expand Patient Care Facility UK Project #2615.0 ADDENDUM No. 2.1 Early Sequence Package 2.0: Early Site Utilities Competitive Bid This addendum provides information to clarify or adjust construction items which may affect any or all trade contractors. The original documents for the referenced project are amended as noted in this addendum and made part of said documents. NOTE: Addendum #2 was posted on SmartBid with some missing information. This addendum 2.1 contains ALL the same information plus the missing content. Additional information is included as noted below. BID DUE DATE Bid Due Date: Thursday August 27th, 2026, at 3pm EST Bid Opening Date: Thursday August 27th, 2026, at 3:10pm EST Microsoft Teams meeting Join: https://teams.microsoft.com/meet/212501662418526?p=uxg6jvqO05HfijBQ4u Meeting ID: 212 501 662 418 526 Passcode: 4DT9h5Ru Need help? | System reference Dial in by phone +1 773-917-3510,,115929770# United States, Chicago Find a local number Phone conference ID: 115 929 770# For organizers: Meeting options | Reset dial-in PIN GENERAL 1. All General Trades proposals shall be hand delivered to: University of Kentucky Procurement Services 411 South Limestone Lexington, KY 40506 Bid Desk in room 322 Peterson Service Building no later than 3 PM EST. Turner SPO will hand deliver their proposal no later than 2:30 PM EST. 2. RFI log attached. 3. Updated SE-105 attached 4. Division 01 specification is attached for use under this contract. Divisions 03, 05 and 07 specifications are attached for reference for the put back and replacement work. 5. Reference ESP 2.0 – BP#026.01 Electrical Work Scope. Update scope item #15d to NOT include demolition of the existing electrical duct banks. This contractor is still responsible to 8/20/2026 Page 1 of 2 demo the existing electrical manholes and to pull out the existing cabling and to demo the existing electrical manholes. a. This contractor is also still required to demo the existing communications ductbanks and manholes where this is expected to be with the installation of the new electrical ductbanks shown. b. The Reference drawings 2-SE-101. 6. Reference ESP 2.0 drawing 2-SE-101, coded note #3. The Electrical Contractor shall not include removal of concrete ductbanks. Include removal of all cabling only. Include demolition of all other items in the coded notes listed on this page.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Other bids open in Kentucky. 766 open bids in Kentucky — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Aug 21, 2026 | ID: 76061814

Open Other Bids in Kentucky

KYSchoolOpenTODAY
Science Equipment/ Materials/ Supplies Catalog Contract
Fayette County Public Schools · #28-26
Other
KYStateOpenTODAY
Rfb-88-27 26050amlbaml, Pike County
BidNet Direct - Kentucky
Other
KYStateOpenOct 22, 2026
26-1022 Liquid Nitrogen
Louisville MSD · #26-1022
Other
KYStateOpenOct 22, 2026
Empire Rd (ky 1296)
BidNet Direct - Kentucky
Other