Garrett County Government Department of Financial Services Purchasing Division 203 South Fourth Street, Room 206, Oakland, Maryland 21550 garrettcountymd.gov/financial-services/purchasing A D D E N D U M 1 DATE: October 5, 2026 TO: All Bidders FROM: Trevor Butler Purchasing Agent RE: Request for Proposal #26-1008 Engineering Services Friendsville Wastewater Treatment Plant Improvements Please note the following clarification to Request for Proposal #26-1008 Engineering Services Friendsville Wastewater Treatment Plant Improvements resulting from a question received from an interested bidder: 1. Is flow monitoring data available for the existing sewer system? Answer: WWTP flow data is available. 2. Can you provide a map or figure showing the extents of the collection system? Answer: The available as-built drawings will be provided. No separate collection system map or figure is currently available. 3. Can you provide information on the size of the collection system, including the number of manholes, length of piping, and diameter of the sewers? Answer: The County can provide the information available on the as-built drawings. No separate inventory or summary of the collection system is currently available. 4. Is the I&I study under Scope Item 3.4, Alternatives Development and Evaluation, part of this effort for the PER or to be included as an alternative for future work? Answer: The I&I study should be included as an alternative for future work and is not part of the current PER effort. 5. If the I&I study is part of the PER, should it include flow monitoring and/or an SSES? Answer: Not applicable. The I&I study is not part of the current PER effort. 6. Is a hydraulic model of the collection system included in the PER effort? Answer: No. A hydraulic model of the collection system is not included in the PER effort. 7. Will as-builts be provided? Answer: Yes. Available as-built drawings will be provided. purchasing@garrettcountymd.gov - Phone 301-334-5003 – Fax 301-334-5000 8. Will hourly data for the two collection system pump stations be provided? Answer: Pump runtime data can be provided; however, the data is not currently available and will need to be collected Please acknowledge receipt of Addendum 1 by initialing the appropriate section on the Signature to Bids Page of the bid package. 2/2
Unlock the source link for this bid, plus email alerts when similar Other bids open in Maryland. 1,215 open bids in Maryland — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today