Accord Pond Pipe and Apparatus Installation

MAHinghamcityWater & Sewer
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
176235
Open Date
Jun 10, 2025
Close Date
--
Status
Closed

Description

The Town of Hingham owns and operates (through Weir River Water System) an existing pump house for the purposes of withdrawing water from Accord Pond. The pump system itself is housed in a structure that is approximately 36’x25’ and connects to a gate house before the main intake lines extend out to the pond.According to available records there are currently two intake lines in the pond. One is an inactive, partially buried, 10” pipe that is connected directly to the pump house and extends approximately 400 feet into the pond. The active line exits the gatehouse before extending 50 +/- feet into the pond and is a 16” Cast Iron (C.I.) pipe.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Water & Sewer bids open in Massachusetts. 2,905 open bids in Massachusetts — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Apr 27, 2026 | ID: 320402

Open Water & Sewer Bids in Massachusetts

MAStateOpenTODAY
Wastewater Treatment Plant Roof A/C Replacement
BidNet Direct - Massachusetts
Water & Sewer
MAStateOpenTODAY
Supply and Deliver Water Treatment Chemicals for Participating Western MA Entities
BidNet Direct - Massachusetts
Water & Sewer
MAStateOpenAug 14, 2026
Drainage Repair
BidNet Direct - Massachusetts
Water & Sewer