4th Ave S Over ARGO Bridge Repair

WASeattlecityConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
279548
Open Date
Jun 29, 2026
Close Date
--
Status
Open

Description

Project Description: This project rehabilitates the existing 4th Ave S over ARGO Bridge pier corbels using a 77 day full closure of the bridge. Work involves crack injection, concrete spall repair, Carbon Fiber Reinforced Polymer strengthening, partial demolition of select corbels, increasing the depth of the concrete overhangs using new reinforced concrete connected to the existing concrete using dowels, additional of external post-tensioning, and replacement of expansion joints. Temporary traffic control and channelization will be required. For the purpose of the Bidder/Subcontractor List, this project includes Rebar Installation and Structural Steel Installation.Engineer's Estimate: $6,700,000 to $7,000,000Project Location: Industrial District along 4th Avenue South over the ARGO Yard; north of S Dawson St and south of S Industrial Way.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,431 open bids in Washington — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 1, 2026 | ID: 36228603

Open Construction Bids in Washington

WAUnivOpenTODAY
Advertisement for Bids 208453 UW Tower Elevator Modernization
University of Washington
Construction
WAStateOpenTODAY
BID - DSHS - TCCS - Main Building Generator Replacement - Dept of Social & Health Services
WEBS (State Portal) · #2024-454 G (2-1)
Construction
WACountyOpenTODAY
King County International Airport Pavement Improvements Work Order 2026
King County · #KC001683
Construction