EJCDC STANDARD FORM OF AGREEMENT BETWEEN Owner AND Contractor ON THE BASIS OF A STIPULATED PRICE THIS AGREEMENT is dated as of the day of in the year 20___ by and between TOWN OF SURFSIDE, a Florida municipal corporation (hereinafter called “Owner”) and __________________________________ (hereinafter called “Contractor”). RECITALS: WHEREAS, in response to the Owner’s solicitation of bids ITB No. 2018-01 for traffic signal modifications to Harding Avenue (“Project”), Contractor submitted a proposal for the Project, which Proposal is incorporated herein by reference and made a part hereof, and WHEREAS, Contractor submitted the lowest, responsive and responsible bid in response to the solicitation, and was selected and awarded this Contract for performance of the Work (as hereinafter defined); and WHEREAS, Contractor has represented to the Town that it possesses the necessary qualifications, experience and abilities to perform the Work or the Project, and has agreed to provide the Work on the terms and conditions set forth in this Agreement. NOW, THEREFORE, for and in consideration of the premises and the sum of TEN AND NO/100 DOLLARS ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, Owner and Contractor do hereby agree as follows: Article 1. WORK. Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ Article 2. ENGINEER. The Project has been designed by: Calvin, Giordano & Associates, Inc. 1800 Eller Drive, Suite 600 Fort Lauderdale, FL 33316 (954) 921-7781 who is hereinafter called Engineer and who is to act as Owner's representative, assume all duties and responsibilities and have the rights and authority assigned to Engineer in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. 1 Article 3. CONTRACT TIMES. 3.1. The Work will be substantially completed within 90 calendar days after the date when the Contract Times commence to run completed and ready for final payment in accordance with paragraph 14.07 of the General Conditions within 120 calendar days after the date when the Contract Times commence to run.
Unlock the source link for this bid, plus email alerts when similar Roads & Paving bids open in Florida. 2,474 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today