The project is focused on restoring the electrical systems of the 29th Street Pump Station to full functionality at both the pump station and its associated electrical building. To achieve this, a range of repairs and improvements will be undertaken. Key objectives include repairing water damage in the pump station vault, repairing HVAC systems in the vault and electrical building, improving the float switches in the wet well, waterproofing the vault's sump pump, and improving electrical wiring at the vault's lid.Overall, the initiative focuses on modernizing infrastructure, enhancing redundancy, and, most importantly, ensuring that all systems operate. This will thereby contribute to the efficient management and reliable operability of the pump station.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Colorado. 1,083 open bids in Colorado — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today