26th Street Bridge #1321: Bridge improvement project to remove and replace the existing bridge over the Boise City Canal with a 6’x4’ concrete box. Project includes constructing pedestrian facilities on the west side of the roadway to Hill Road. Fiddler Drive Bridge #1510: Bridge improvement project to remove and replace the existing CMP bridge over the Zinger Lateral with an 8’x3’ concrete box. Munger Road Bridge #1462: Bridge improvement project to remove and replace the existing bridge over the Foothill Ditch with a 5’x3’ concrete box.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Idaho. 488 open bids in Idaho — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today