EXHIBIT A1 WO 473991 | ITB 13-26 Vineyard Ln OH to UG Conversion 1. STATEMENT OF WORK CONTRACTOR SHALL PERFORM THE FOLLOWING WORK (“Work”): The Work shall be bid as a single Lump Sum Bid. The approximate scope of work is summarized below. Contractor is responsible for the Work as shown on the EPUD job maps based on actual field conditions. Quantities should be field verified by the bidding Contractor prior to bid. Install the following (see EPUD job maps for routing and endpoints): Primary Trunk: (x3) 2" conduits per run • Existing pole 1706273102 to Cabinet 170627002310 • Cabinet 170627002310 to Cabinet 170634002312 • Cabinet 170634002312 to Cabinet 170634002314 • Cabinet 170634002314 to Cabinet 170634002316 Primary Laterals: (x1) 2" conduit per run unless noted • Cabinet 170627002310 to Transformer 170627002311 • Cabinet 170634002312 to Transformer 170627002313 • Cabinet 170634002314 to Transformer 170634002315 • Cabinet 170634002316 to Transformer 170634002317 • Cabinet 170634002316 to Transformers 170634002318 and 170634002319: (x2) 2" conduits, one to each transformer Secondary: (x1) conduit per run • 3" conduit: – Transformer 170627002311 to JPED 170627002320 – Transformer 170627002313 to existing meter base 77036754 – Transformer 170634002315 to existing pole 1706343801 – Transformer 170634002317 to JPED 170634002322 – Transformer 170634002318 to Transformer 170634002319 – Transformer bank 170634002318/170634002319 to existing pole 1706343803 • 2" conduit: – JPED 170634002322 to existing north meter base 77080130 • 1" conduit: – Transformer 170634002317 to existing light pole 1706343804 Approximate Route Footage • Three-phase primary (x3 2"): 2,072' • Two-phase primary (x2 2"): 297' • Single-phase primary (x1 2"): 404' • 3" secondary: 104' • 1" secondary: 104' • Total route: 2,981' Page 1 of 5 EXHIBIT A1 WO 473991 | ITB 13-26 Vineyard Ln OH to UG Conversion Approximate Conduit Totals • 2" conduit: 7,300' • 3" conduit: 110' • 1" conduit: 110' Equipment • (x4) 94"x47" three-phase fiberglass cabinet sleeves, with associated grounding • (x6) 53"x50" single-phase fiberglass transformer sleeves, with associated grounding • (x2) 30"x24" secondary JPEDs Installation Requirements • Fiberglass sweeps are required on any conduit run over 500'. • Install locatable mule tape in one conduit of each size in every run. EPUD shall furnish the JPED, cabinet, and transformer sleeves listed above for Contractor to install.
Unlock the source link for this bid, plus email alerts when similar Other bids open in Oregon. 1,514 open bids in Oregon — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today