Project Description: The City of Seattle, through Seattle Department of Transportation (SDOT), requests Statements of Qualifications, with the goal of contracting for the following key staff:1 full time Resident Engineer, 2 full time Construction Inspectors, ¾ time Change Order/Scheduling specialist, ½ time Office Engineer, ½ Doc Control/Contract Admin, and 1 part time Outreach support to provide Construction Management (CM) services on the AAC East Marginal Way project, as part of the overall CM team managing the construction contract for the project.AAC East Marginal WayThe AAC East Marginal Way Project includes pavement preservation work (a 2" asphalt mill & overlay) on the southern portion of E Marginal Wy S. This pavement preservation project (a mill & overlay) is intended to extend the life of the existing pavement structure by 10 to 20 years. The project was awarded a $6.87M PSRC preservation grant. Scope of AAC work is typical of completed projects. Base repairs, ADA curb ramps, Stormwater Code mandated drainage improvements, striping & signal loop restoration, and the final surfacing course will all covered by AAC. Additional improvements and funding for those will be identified during the Complete Streets planning process.Construction Contract Information Estimated construction contract value: $11 millionEstimated pre-construction services (contract document review): December 2026Estimated construction duration: February 2027 – February 2028Estimated construction closeout: February 2028 – July 2028Work will be accomplished in accordance with the FHWA reviewed project Plans and Specifications advertised for construction. For additional project information, please see the project website:<a href="https://seattle.gov/transportation/proj
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,409 open bids in Washington — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today