This project is located within Sections 17, 18, 19, and 20, T14S, R14E of the Gila and Salt River Meridian, within the City of Tucson, Pima County, Arizona. This project provides improvements to 22nd Street from Kino Parkway to Tucson Boulevard. Additional improvement locations include the Campbell-Beverly Connection, the Campbell Avenue Ramp, Ramps A and B at Barraza-Aviation Parkway, eastbound Barraza-Aviation Pkwy realignment, several Cross Streets, and the Multi-Use Path that runs alongside Barraza-Aviation Pkwy under Ramps A and B and traverses underneath 22nd Street. A multi-use connection between the Barraza-Aviation Path and multi-use path along eastbound 22nd Street.The work consists of reconstructing 22nd Street from Kino Parkway to Tucson Boulevard and replacing the existing 4-lane 22nd Street bridge that runs over Barraza-Aviation Parkway and the Union Pacific Railroad (UPRR) with a new 6-lane facility. The facility will consist of two 3-lane bridges with a protected eight-foot multiuse path, one for the eastbound travel direction and one for the westbound travel direction. In addition to the bridge components, improvements shall consist of cast-in-place retaining walls; asphaltic concrete and Portland cement concrete paving, concrete curb/curb and gutter, concrete barrier and sidewalk, paved pathways; a drainage channel, pipe culverts, storm drains, manholes, catch basins and associated inlet and outlet structures; street lighting; landscaping and irrigation; pavement marking and signing; traffic signal improvements at the Tucson Boulevard intersection and Barraza-Aviation Pkwy/Ramp B; sewer modifications; water modifications, and other incidental work.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Arizona. 937 open bids in Arizona — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today