Terminal Expansion Construction and Management | RFP #2023-22 Addendum #6 1000 Col. Eileen Collins Blvd. Syracuse, NY 13212 p – 315.454.3263 f – 315.454.8757 bids@syrairport.org ADDENDUM #06 November 8, 2023 Note: To request access to the SRAA 2023-22 SharePoint site housing the drawings and specifications for this project, please contact bids@syrairport.org. Asked November 6, 2023 • Ref: NC & SC Specification section 075216 SBS Modified Bituminous Membrane Roofing o 2.8.B,4.A “Base layer: 2.6’” ▪ It’s assumed that the base layer should be 2.6 inches not 2.6 feet • Please clarify if otherwise Corgan Response : correct base layer should have read as 2.6” thickness. Please refer to NEW YORK STATE ENERGY CONSERVATION CODE table on G00-10 for required roof insulation. To be R30ci, including tapered insulation. o 3.13 Field Quality Control ▪ B.1 Infrared Testing & B.2 Impedance Testing • Please clarify whether the owner or the contractor is responsible for the costs of these test as Item 1.c.1 “Cost of retesting is Contractor’s responsibility” implies that the owner is doing the testing. Corgan Response : 3.13.B.1 and B.2 Testing and re-testing is required by contractor. o B.1.a & B.2.a “Perform tests before overlying construction is placed” ▪ As this is new construction, please clarify what the testing is looking for if done prior to overlying construction is placed? Corgan Response : Testing will be required at new and existing roofs impacted by areas of renovation. • Ref: NC Drawing A08-01 flysyracuse.com o The Door Schedule has two columns “CBP Door” and CBP Code Door and Frame”. It is uncertain what this relates to and what cost implications it has on this bid. ▪ Please clarify. • Corgan Response : column “CBP Door” indicates the door located within the CBP space. Please disregard column “CBP code Door and Frame”, column will be removed in addendum 1 Ref: NC & SC specification 077253 Snow Guards o The specification appears to imply that these snow guards are attached to a metal roof. ▪ The SC drawings do not have a metal roof so it is assumed that this section is not valid for the south concourse. • Please clarify if otherwise Corgan Response : correct, section not valid for south concourse. o The drawings NC A02-03F and A05-23 ▪ This shows a metal roof, but no snow guards. If this is where the snow guards are to be installed, the manufacturer needs more information (# rows, type, etc) for proper pricing.
Unlock the source link for this bid, plus email alerts when similar Other bids open in New York. 2,346 open bids in New York — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today