This project on Poplar Street from Curtis Road to Cole Road will include pavement rehabilitation and asphalt pavement improvements, irrigation and stormwater work, upgrading pedestrian ramps to be ADA compliant, filling sidewalk gaps, adding traffic calming features including traffic circles at the Eldorado Lane and Liberty Street intersections, installing an enhanced pedestrian crossing at the Poplar Street and Cole Road intersection, including multi-use pathway (MUP) improvements to the Curtis Road intersection, adding wayfinding signage and sharrows throughout the project limits, and installing a raised concrete intersection at Poplar Street & Fisk Street.
Unlock the source link for this bid, plus email alerts when similar bids open in Idaho. 540 open bids in Idaho — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today