The work for the 2026 Pump Station Replacements – Foss 2 and Sabattus shall consist of, but not be limited to, the complete and satisfactory construction and installation of the following at both the Foss 2 and Sabattus pump stations: Removal of an existing Smith & Loveless suction pump dry well units set on top of an existing six (6) foot diameter concrete wet well (to remain), install additional six (6) foot diameter precast concrete barrel sections extending the existing wet well up to surface grade, remove existing concrete chamfer at the bottom of the existing wet well, new submersible pumps, ductile iron pipe and fittings, transducer and backup floats, one (1) six (6) foot diameter precast check valve vault, sewer bypass during construction, sewer piping connection to existing force main, electrical transfer switch, electrical service line and meter, conduits, wiring connections, VFD/control panel, new backup generators, sitework as necessary and anything else incidental to the proper completion of the project as outlined or implied in the Plans and Specifications. Refer to the plans for installation and materials.
Unlock the source link for this bid, plus email alerts when similar Water & Sewer bids open in Maine. 284 open bids in Maine — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today