2026-0011-PW Avenida del Sur and College Dr. Extension IFB Addendum No. 1

NMSanta Fe CountycountyOther
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
--
Status
Open

Description

Justin S. Greene Adam Fulton Johnson Commissioner, District 1 Commissioner, District 4 Lisa Cacari Stone Hank Hughes Commissioner, District 2 Commissioner, District 5 Camilla Bustamante Gregory S. Shaffer Commissioner, District 3 County Manager August 19, 2025 SANTA FE COUNTY IFB No. 2026-0011-CSD/BM AVENIDA DEL SUR AND COLLEGE DR. EXTENSION PROJECTS ADDENDUM NO. 1 Dear Proponents, This addendum is issued to reflect the following immediately. It shall be the responsibility of interested Bidders to adhere to any changes or revisions to the IFB as identified in this Addendum No. 1. This documentation shall become permanent and made part of the departmental files. Attachment A: Pre-Proposal Agenda Attachment B: Updated Bid Form Question No. 1: Do the non-collusion affidavit for subcontractor and the certification of subcontractor regarding equal employment opportunity need to be turned in with the bid, or are these to be provided by the subcontractor after award? Answer No. 1: Only the prime bidder’s Non-collusion Affidavit and Equal Employment opportunity forms are required to be included in the bid. Once the contract is awarded, the subcontractor’s documents will then be required. Question No. 2: On Avenida del Sur, the Utility sheets and cross sections show the 4” natural gas line in the Base Course, AC Course, and above the final roadway surface. Will the 4” natural gas line be relocated prior to NTP and if so, where will it be relocated to? Answer No. 2: The Gas line will be relocated to the south side of the roadway prior to the estimated start of the phase 2 construction of ADS. It will be relocated between the ROW and the water line in the area where there is cut in the roadway, following the relocation of the overhead electric poles, which is expected to begin in September. 102 Grant Avenue · P.O. Box 276 · Santa Fe, New Mexico 87504-0276 · 505-986-6200 · FAX: 505-995-2740 www.santafecountynm.gov Question No. 3: On Avenida del Sur, p. 144 shows new sidewalk being constructed outside of the ROW limits. Is that additional ROW being acquired? If so, where will the new ROW limits be relocated? Answer No. 3: The only location where the sidewalk is currently shown outside of the right of way is at the western edge (STA 23+00). This area is currently in the acquisition process and will include the triangle area up to the culvert outflow. Question No.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Other bids open in New Mexico. 1,112 open bids in New Mexico — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jun 27, 2026 | ID: 33285204

Open Other Bids in New Mexico

NMCountyOpenTODAY
05 Addendum 1 Musketball Drive & Cedar Creek Roads
Lincoln County · #26-05
Other
NMCountyOpenTODAY
05 Musketball Drive & Cedar Creek Drive
Lincoln County · #26-05
Other
NMCountyOpenTODAY
02 Plan Set Musketball Drive & Cedar Creek Drive
Lincoln County · #26-02
Other
NMStateOpenTODAY
Replacement Of Wemco Hydrogritter
NM GSD State Purchasing
Other