As part of the City of Caldwell's Project Title project, connecting to existing sewer and installing approximately 4,700 LF of 21" Sewer pipe at a depth of approximately 17' south of Ustick Rd. on Florida Ave. and connecting to existing sewer pipe near Homedale Rd. Construction will include testing of sewer trunk line as well as trench cut detail and compaction requirements per R-303 City of Caldwell standard drawing.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Idaho. 488 open bids in Idaho — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today