The City of Santa Cruz Water Department (City) desires to rehabilitate Tait Wells 1B, 3B, and 4, and Beltz Well 10, by chemical and mechanical means to restore lost well performance. Beltz 10 was never fully and properly developed after well construction due to limitations that existed at that time for the disposal of well development water. That situation has since been resolved and the City now seeks to maximize the production capacity of the well through a rigorous well rehabilitation/well development program.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today