In general, this project will consist of removing and replacing 383 lineal feet of 8” VCP pipe with 12” PVC pipe, installing 305 lineal feet of 12” PVC pipe, removing and replacing 522 lineal feet of 8” VCP pipe to 14” HDPE pipe by horizontal directional drilling, installing 271 lineal feet of 14” HDPE pipe by horizontal directional drilling, removing and replacing three existing 48” manholes, installing two 48” manholes, placing 51 vertical feet of epoxy coating, abandoning one 48’’ manhole, placing 53 tons of riprap (river rock), and reinstating 17 services. Construction shall be completed as detailed in the plans and specifications for this project.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Colorado. 1,083 open bids in Colorado — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today