In general, the work shall consist of furnishing all labor, materials, equipment, and incidentals for construction of the following work:Improvements to the Dissolved Air Flotation Unit ProcessInstallation of a new Liquid Sludge Receiving Station adjacent to the existing Sludge Storage Tanks (SSTs),Replacement of piping, valves, vault demolition, and other appurtenances related to two Easterly Sludge Force Main Vaults,Replacement of the existing Waste Heat Boiler (WHB) dry ash pneumatic conveyance system with slurry system, replacement of existing scrubber drain header, and installation of new backup scrubber drain header.Cleaning of sludge, grit, and debris from four (4) of the existing SSTs.Replacement of exhaust fans in four (4) SSTs,Modifications of four (4) SST domes,Installation of air bubble mixing systems in four (4) SSTs.Replacement of existing Maintenance Building Lift Station,Structural repairs to six (6) existing Gravity Thickeners.Replacement of
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Ohio. 1,200 open bids in Ohio — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today