100% Design and Construction Phase Services – CONRAC | RFP #2023-16 Addendum # 5 ADDENDUM #05 1000 Col. Eileen Collins Blvd. Syracuse, NY 13212 p – 315.454.3263 f – 315.454.8757 bids@syrairport.org AUGUST 16, 2023 RFI #1: Question: Scope of work section 9 Construction Phase-Observation (Add alternate#1) Page 19 of RFP. Will the Airport provide a trailer or office space? Will the A/E consultant have to provide temporary office space? Telephone, fax. Email services etc. Will the consultant pay for the testing firm/s? Can the Airport list the firms required ie: Concrete? Steel? Others? If the AE is paying for this service? Response: At this time, the Syracuse Regional Airport Authority does not plan to provide a trailer or office space. The consultant will be responsible for providing their own office space. Add Alt 1 should include Construction Inspection services cost proposed by the consultant. At this time, we do not have a list of the testing required. Consultant is expected to complete the due diligence process on project requirements. RFI #2: Page 20 of RFP. Is this part of Base scope of work or part of Add alternate #1, It would seem as part of base scope of services. Please clarify. Response: All items listed on Page 20 are a part of Add Alternate #1. RFI #3: Clarification. Page 2 General Information.1,2 “Intent and purpose of this RFP…100% design and construction phase services. The A/E firm is not performing actual construction work or acting as Construction manager? Please clarify. Response: The successful proposer will act as the Construction Inspector, if Add Alt 1 is awarded. No construction services will be performed as a part of this design RFP. flysyracuse.com
Unlock the source link for this bid, plus email alerts when similar Other bids open in New York. 2,319 open bids in New York — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today