Santee School District Bid Chet F Harrit Asphalt BASE BID: REMOVE ALL EXISTING ASPHALT IN RED SECTION ON MAP AND REPLACE WITH NEW MATERIALS PER SPECIAL CONDITIONS(See attached Ninyo & Moore) BID PRICE (IN WRITTEN FORM) BID PRICE (IN NUMBERS) Said Sum includes all applicable taxes and costs Said Sum includes all applicable taxes and costs $ Bid Add Option: REMOVE ALL EXISTING ASPHALT IN YELLOW SECTION ON MAP AND REPLACE WITH NEW MATERIALS PER SPECIAL CONDITIONS(See attached Ninyo & Moore) Option 1: Grind removed materials to spec and reuse as Base Material. $ Option 2: Import Base Materials. $ Replace/Install 2x8 headers $ TOTAL BID: Includes all Red, Yellow, areas with 8 inch base material and 4 inches of asphalt. Also included is striping in main playground and Kindergarten as well as 2 sesal coats for both areas plus the area between Red and yellow where asphalt remains. • • • $ Contractors shall follow all processes as written in the Geotechnical Report from Ninyo & Moore Contractor Shall base bid on traffic index 7 (Fire Lane) as indicated on Page 5 of the report Follow proper protocols for site subgrade preparation of the upper 12 inches and base compactions details.
Unlock the source link for this bid, plus email alerts when similar Other bids open in California. 5,008 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today