Construction will begin in the summer of 2025 school year on the occupied site. And continue construction while school is still in the 2025-2026 school year. Need to have experience executing a phase construction plan. PCSD is keeping four buildings (8,14,15,16) on site one of which is a historical gym. While the other three have 300 student stations combined between the them. There is a total of 450 students at this site.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today