017 Technical Specs

GATuckercityOther
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
2024-017
Open Date
--
Close Date
--
Status
Open

Description

TUCKER PICKLEBALL COURTS September 10, 2024 SECTION 01 1100 – SUMMARY OF WORK 1.1 A. 1.2 A. 1.3 A. RELATED DOCUMENTS Drawings and general provisions of the Contract and associated addenda, apply to this section. SUMMARY This Section includes the following: 1. Work covered by the Contract Documents. 2. Type of the Contract. 3. Work phases. 4. Work under other contracts. 5. Use of premises. 6. Owner's occupancy requirements. 7. Work restrictions. 8. Specification formats and conventions. WORK COVERED BY CONTRACT DOCUMENTS Project Identification: Tucker Pickleball Courts 1. Project Location: 4898 Lavista Road Tucker, GA 30084 B. Owner: The City of Tucker (1975 Lakeside Pkwy., Suite 350, Tucker, GA 30084) C. Landscape Architect of Record: Root Design Studio, 2300 Henderson Mill Road Suite 412, Atlanta GA 30345 D. The Work consists of the following: 1. The Work includes the construction of new pickleball courts, a parking lot, a new pavilion and restroom building (Alternate 1), modifications to an existing driveway, installation of storm drainage and underground detention structure, site lighting, sports lighting and utility installation, hardscape installation, and landscape installation. SUMMARY OF WORK 01 1100 - 1 TUCKER PICKLEBALL COURTS 1.4 A. 1.5 A. September 10, 2024 TYPE OF CONTRACT Project will be constructed under a general construction contract (sample included). WORK PHASES The Work shall be conducted in one phase: 1. Phase One: The work primarily involves but is not limited to the construction of new pickleball courts, a parking lot, a new pavilion and restroom building (Bid Alternate 1), modifications to an existing driveway, installation of storm drainage and underground detention structure, site lighting, sports lighting and utility installation, hardscape installation, and landscape installation. B. Before commencing Work, submit a schedule showing the sequence, commencement, and completion dates, for all aspects of the Work. C. A preconstruction conference between, at a minimum, the Owner, contractor, and the design professional(s) shall be conducted prior to commencement of work. 1.6 A. 1.7 A. 1.8 A. USE OF PREMISES General: Contractor shall have full use of premises for construction operations, including use of Project site, during construction period. Contractor's use of premises is limited only by Owner's right to perform work or to retain other contractors on portions of Project.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Other bids open in Georgia. 2,515 open bids in Georgia — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 6, 2026 | ID: 42168908

Open Other Bids in Georgia

GACountyOpenTODAY
EPWSA Eastside Dewatering Project
Bryan County
Other
GACountyOpenTODAY
Clearing & Grubbing
Coffee County
Other
GAStateOpenTODAY
Aircraft Maintenance Fixture for KC-135 Spoiler Actuator
BidNet Direct - Georgia
Other
GACountyOpenTODAY
Scotland TIA 2 Band 1: Dirt to Pave
Bryan County
Other