CITY OF TUCKER ACKNOWLEDGE RECEIPT OF ADDENDUM #1 FORM ITB 2024-017 TUCKER PICKLEBALL AND PARKING LOT CONSTRUCTION Upon receipt, please print and add to your proposal. I hereby acknowledge receipt of the supplement pertaining to the above referenced bid. COMPANY NAME: CONTACT PERSON: ADDRESS: CITY: STATE: PHONE: FAX: EMAIL ADDRESS: SIGNATURE DATE 1 ZIP: ITB 2024-017 ADDENDUM #1 1. This addendum is being issued to all Bidders to provide clarification and/or modifications to the Tucker Pickleball Courts Construction bid documents. 2. The information included in this addendum is made part of the ITB noted above and part of any contract that may be awarded for this ITB. 3. The purpose of this addendum is to provide response to posed questions and provide clarification or revisions to the Bid Documents. 4. If there is a conflict between any previously supplied information and the information contained in this addendum, the information in this addendum shall govern. 5. Bidders must acknowledge receipt of this addendum with your bid submission. Failure to acknowledge receipt of the addendum does not release the bidder from the requirements set forth below but may be grounds for rejection of the bid. 6. The Bid Documents are hereby modified in the following respects: 1 QUESTION Does the court surfacing system only need one coat of acrylic resurfacer, typically two coats are installed? ANSWER The courts shall receive two coats of acrylic resurfacer as a base course. The ‘Pickleball Surfacing Notes’, sheet C-502, has been revised. Refer to Drawing Revision Enlargement C-502 attached. The concrete paving and walkways around the pavilion are not included in the base bid and are bid alternate #1. The utilities should be stubbed up adjacent to the restroom building as part of the base bid. As part of bid alternate #1, the utilities should be connected to the restroom building. Refer to page 35 of 35 of the project manual for more information. Sheet C-400 has been revised to correctly reflect this information, Refer to Drawing Revisions, Sheet C-400 attached. 2 Is the concrete paving and walkways around the pavilion included in the base bid? Are the utilities to the restroom building included in the base bid? 3 Is a General Contractor’s license required for this project? Yes, bidders must hold a General Contractor’s License in the State of Georgia.
Unlock the source link for this bid, plus email alerts when similar Other bids open in Georgia. 2,188 open bids in Georgia — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today