CITY OF TUCKER ACKNOWLEDGE RECEIPT OF ADDENDUM #1 Publish Date: November 25, 2025 ITB #2025-017 IDLEWOOD ROAD ROUNDABOUTS AT FELLOWSHIP ROAD AND SARR PARKWAY Please complete this page and include this page only in bid submittal. I hereby acknowledge receipt of the supplement pertaining to the above referenced bid. COMPANY NAME: CONTACT PERSON: ADDRESS: CITY: STATE: PHONE: FAX: EMAIL ADDRESS: SIGNATURE DATE 1 ZIP: ITB #2025-017 ADDENDUM #1 1 QUESTION The stations for the handrail are not on the drawings, and other than one mention to handrail on page 130001A, they are missing from the drawings. Will there be additional drawings released with the handrail included? ANSWER Handrail is included as part of the special design spillway. Please refer to Dwg. 05-007 of the Idlewood Road at Sarr Parkway Roundabout plan set. Per the Cost Proposal, please refer to PAY ITEM 515-2050 – HANDRAIL SPECIAL DESIGN. Additionally, the railing referenced in the plans shall be altered to the following – per the City of Tucker’s City Standards Guidebook Landscape and Site Elements January 2025. 2
Unlock the source link for this bid, plus email alerts when similar Other bids open in Georgia. 2,515 open bids in Georgia — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today