PCITY OF TUCKER ACKNOWLEDGE RECEIPT OF ADDENDUM #2 Publish Date: May 26, 2026 ITB #2026-015 STORMWATER SYSTEM REPAIR PROJECTS Please complete this page and include this page only in bid submittal. I hereby acknowledge receipt of the supplement pertaining to the above referenced bid. COMPANY NAME: CONTACT PERSON: ADDRESS: CITY: STATE: PHONE: FAX: EMAIL ADDRESS: SIGNATURE DATE 1 ZIP: ITB #2026-015 ADDENDUM #2 1 2 3 4 5 6 7 8 QUESTION Within the ITB document, under Purpose, Intent and Project Description, to download the complete scope and information for this task order 49, we must request information through this email. Could you please share the additional files with me? Is there a list of approved hydrants that the contractor is allowed to use for the cleaning and rehab of this project? Under the special conditions, it states if contractors use hydrants than the water must be metered. Will the Owner provide the water meters, and will the Owner provide the water at no cost to the contractor? Under Special Conditions, it state that removed material must be contained in leak-proof containers and hauled to an approved disposal facility. Please confirm the type of waste classification (e.g., non-hazardous, special waste, municipal solid waste) for the sediment and water mixture. ANSWER There have been no more documents created to be shared. The complete solicitation is: ITB 2026-015 Bid Manual ITB 2026-015 Addendum 1 This Addendum: ITB 2026-015 Addendum 2 Will the contractor be provided with a dumpsite for sewer debris at no cost? Will the Owner provide an overnight parking site for equipment at no cost to the contractor? What is the budget for each location or overall? No. That shall be included in the cost of cleaning. If funding is insufficient to award both locations, please confirm whether the Owner intends to remove locations from the award. If unable to fund – this bid will be rejected and edits to the scope will be made by City staff and readvertised. Hydrants within the public right of way may be used. Contractor must have their own portable meter account with Dekalb County. No. Water meters shall be provided by the contractor and paid for via the line item for cleaning. There may be a combination of waste. It’s unknown what to expect. However, waste shall be disposed of accordingly. That is, if hazardous waste is found/identified, it shall be disposed of at the proper disposal location and handling. No.
Unlock the source link for this bid, plus email alerts when similar Other bids open in Georgia. 2,515 open bids in Georgia — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today